ERRA for Quality Assurance
A gate that refuses a blocker outright, and an override that leaves a written reason instead of a verbal exception.
What you do in ERRA
You review a formula version against the release-readiness gate before it can be approved: a blocker refuses the approval outright, and an unmeasured dimension needs a written acknowledgment before you can proceed past it.
You run the deviation, nonconformance, CAPA, and complaint lifecycle, sign the release decision on a production batch, and, when a blocker has to be bypassed, you sign the override with a reason that goes into the audit trail, not a verbal exception.
What ERRA gives you
- An enforced release-readiness gate at formula approval, batch release, and production promotion: the banner you see and the gate that refuses the click read from the same function. Formulas you import keep their prior approval, clearly marked as imported. Adopting one runs it through ERRA's release gate, after which it is tracked like any approval decided in ERRA.
- A structured root-cause analysis requirement before a deviation or nonconformance can close.
- A nine-point batch release gate, with second-person verification enforced by permission, not by policy memory.
- A signed override path, requiring the elevated permission and a written reason, recorded in the audit trail and the signature manifest.
- Training compliance rollup, calibration records, and a deterministic quality KPI glance.
What you're checking, and what ERRA's gates check
ERRA's gates check the record: that the gate ran, that the blocker was refused or acknowledged in writing, that the signature is bound to the content it approved. What the record says about your product is your call, made by you, with a written reason where you overrode a gate.
Keep reading
It starts with a record that can be checked.
Recorded and shared through ERRA.